Design of Precast Parabolic Channels in Peshawar
Discrepancy feature is the conveyance losses (35 to 50%). Irrigation system of KPK (Province of Pakistan) is facing severe Operational problems including water scarcity, water logging, and salinity. Reason was due to the traditional brick lining. The following steps are involved