Tests Applied on Concrete for Strength and Workability
SAMPLING The first step is to take a test sample from the large batch of concrete. This should be done as soon as discharge of the concrete commences. The sample should be representative of the concrete supplied. The sample is taken in one of two ways: For purposes of accepting or rejecting the load: Sampling after 0.2 m3 of the load has been poured. For routine