Sand and Gravel Foundation Design for Dams
For the design of earth fill dams, presented the flow of seepage through the foundation and abutments be controlled so that no internal erosion occurs and there is no sloughing in the area where the seepage emerges. This criterion also requires that the amount of water lost through seepage be controlled so that it does not interfere with planned project functions.