Dynamic formulae are used for driven piles. Static formulae are used both for bored and driven piles. Load testing is the most reliable method to determine the load capacity of the pile in the field. They should be performed on all piling projects. However, they are considerably more expensive than the other methods used to determine pile capacity, and economic