Advertisements
|
Design flow:
-
Calculate the average wastewater flow, Qavg = (70-80) % of average water consumption.
-
Select a peak factor, PF = [(18+√P)/(4+√P)], where P = population in thousands.
-
Calculate the peak wastewater flow, Qpeak = (PF * Qavg)
-
Calculate the allowance for industrial and commercial sewage at the rate of 3734 m3/km2/d (Qind)
-
Calculate the infiltration allowance, Qinf = (5-10) % of Qavg
-
Find the design discharge by adding peak flow, industrial and commeral allowance and infiltration allowance, i.e., Qdesign = Qpeak + Qind + Qinf
|
Diameter of the sewer:
Assume a siutable value for cleaning velocity, determine the area (diamter) of the sewer by using the realtion, Area, A = (Qdesign/V)
Slope using Manning’s equation determine the slope of sewer, V = [(1/n) *(R2/3)*(√S)] |
Urban Town Planning Career Jobs
Here you will find entry level jobs, professional jobs, for fresh graduates, experienced civil engineers, best firms to work for, summer jobs, civil service jobs, all of good salaries.
Sources of Errors in GPS
The sources of errors in GPS, satellite erros, multi-path errors and reciever errors.
The 5 Golden Rules of Project Management
Five golden rules for the success of a projects. Read it... |