This doubt is with respect to Primavera Ver 3.0. When I have a project with 30 buildings and the activities are pretty similar for all 30 buildings, I want the schedule to be done building wise, can I enter multiple activity / wbs codes for each activity or do I need to enter each activity 30 times?